 Seibersdorf, Austria
1987-1990
10,000 meters total net lenght
2 Mw boiler capacity
180 customers supplied with sustainable heat
1,200 tons of straw per year
28 years of reliable service

Over 25 years, and still rolling with the times

The municipality of Seibersdorf, in Lower Austria, understood the great value of switching over from fossil fuels to cleaner, more sustainable energy. They realized that potential by using local resources for the communal heat supply in a biomass installation, fuelled by woodchips, bark and straw. Unlike fossil fuels, biomass is CO2-neutral, of domestic origin, and re-uses bio-wastes for both heat and power.

The Seibersdorf project was an early pioneer in this field with the installation of a straw heating plant in 1986, as the first of its kind in Central Europe. The straw was bought from farmers in the area, pressed with a large baler, and finally used for clean, affordable heat for the local community. The straw ash produced by the combustion, is re-used once more as fertilizer for the local farmers. In 1987, Flexalen proved the most suitable choice for the installation of the district heating network, characterized by its efficiency, ease and speed of installation, and remarkable life expectancy. This has been proven in Seibersdorf because, as almost 30 years later, the network is still in headache-free operation.

“We have visited the installation in Heiligenkreuz (operating since 1983) and have been convinced by the positive experience and support from Thermaflex.”

Mr. DinserInstaller, July 2013

Goals

The replacement of the individual boiler and the use of straw waste was the main intention of this project, but the use of local energy sources for a clean, and affordable heat supply was achieved with improvements in air quality too. The main challenges were posed by the connection of single family homes, the protection of gardens, and the overall planning and selection of pumps and home stations.

For users:

  • High level of comfort.
  • Low installation and heating costs.
  • Heating at maximum efficiency.
  • Local production of heat.
  • Supply and services locally available.
  • No prepayment for fuel.
  • Maintenance-free.

Project Process

In the first stage, the main line was installed and connections were made through butt-welding. By now, all public buildings such as the school, town hall, kindergarten, church and parish hall, and over 50% of households have been connected to the district heating network.

“Technical support and on site assistance – sometimes even with night shifts to complete the project – were very much appreciated and helped to complete the project in time for the winter season 1987/88.”

Mr. BöhmHead of the Cooperative, 1987

Results

180 heating customers were supplied from the network including the housing area, office buildings, kindergarten, a school, farmers, sport facilities and residents. The network’s total length reached 10 km. The boiler has a capacity of 2.2 Mw. They implemented an operational mode for the winter period with a maximum flow temperature of 85°C.The straw was provided from the local farmers in the town with a yearly consumption of 1,200 tons of straw per year. So far, the network has remained maintenance –free at consistent performance for decades.

"…during the redesign of the marketplace Flexalen pipes had to be redirected. After 26 years in operation the Flexalen pipes with Polybutene medium pipes look like new – no deposits, clean surface, stable insulation…"

Mr. WildtFernwärmegenossenschaft Seibersdorf

Additional Info

Organisations:

Fernwärmegenossenschaft Seibersdorf (District Heating company)

Dinser (installation company)

Sturm (boiler company)

Contact UsDownload

You might also like

Thermaflex Enables Carbon-Free Cooling for Soneva Secret

Read more >>

Flexalen Specified for Tallest Building in Benelux

Read more >>

Construction

Zwierzyniecki (Zoo) Bridge Renovation

Read more >>

Utilization of excess heat from Bigadan in Horsens, Denmark

Read more >>

Enhancing Heating Solutions – Zinzia Psychiatric Care Centre

Read more >>

Construction

Insulation for Poland’s Longest Tunnel

Read more >>

High-speed sustainable heating network in Wörgl

Read more >>

Heating and cooling networks

Cranfield University

Read more >>

Heating and cooling networks

Almere District Heating Network

Read more >>

Other markets

Biomass net in Hoce

Read more >>

Drinking water

One local heating network in Stellshagen

Read more >>

Heating and cooling networks

Malstedt – one village – one local heat network

Read more >>

Heating and cooling networks

Housing association in Gorsk

Read more >>

Heating and cooling networks

The domestic heat pump experiment

Read more >>

Heating and cooling networks

Biomass heating in Bogafjell, Norway

Read more >>

Heating and cooling networks

Villa Mercedes Biogas Plant

Read more >>

Heating and cooling networks

Thermaflex and Veolia (former Dalkia) in Romania

Read more >>

HVAC/R

Europe’s busiest trainstation

Read more >>

Heating and cooling networks

Over 30 years of reliable performance for Heiligenkreuz

Read more >>

HVAC/R

The Oberoi Rajvilas India

Read more >>

Communal wood boiler in Yzeron

Read more >>

Ready for the asparagus season

Read more >>

Flexalen in Antarctica

Read more >>

HVAC/R

Straw heating in Seibersdorf

Read more >>

HVAC/R

A not so slippery slope in Kassel

Read more >>

Floating Sauna in Neuruppin

Read more >>

HVAC/R

Haydau – biogas to warm and cool the hotel

Read more >>

HVAC/R

District Heating with biomass in Lichtenegg

Read more >>

Other markets

District heating in Griesheim

Read more >>

Other markets

Biogas plant Otternhagen

Read more >>

Localized district heating in Thal-Aue

Read more >>

HVAC/R

“Astoria” sanatorium in Busko Zdroj

Read more >>

HVAC/R

New housing estate Young Grunwald

Read more >>

Residential area Plava laguna

Read more >>

HVAC/R

Stonehenge

Read more >>

HVAC/R

The Lyngdal project

Read more >>

HVAC/R

Park Hyatt in Goa

Read more >>

ConstructionDrinking water

Westin Playa Bonita

Read more >>

HVAC/R

Thermal Soil Remediation

Read more >>

Construction

Falabella Retail Store, Bogotá Colombia

Read more >>

Construction

Covalia, San Luis Potosi

Read more >>

Heating and cooling networks

Warmtenet Hengelo

Read more >>

Construction

Iberoaméricana Hospital

Read more >>

HVAC/R

Showroom Mercedes-Benz in Sosnowiec

Read more >>

HVAC/R

Data Center 2.0

Read more >>

HVAC/R

City brewery Jongens van de Wit

Read more >>

Heating and cooling networks

Castle Topacz in Poland

Read more >>

Communal biogas at the Moulin Guérin farm

Read more >>

Heating and cooling networks

Seawater for temperature control in Cavalaire-sur-Mer

Read more >>

Keeping cool the Amager Bank HQ in Copenhagen

Read more >>

Heating and cooling networks

Quimper Cathedral

Read more >>

Heating and cooling networks

Housing the Ministry of Defence in Edirne, Turkey

Read more >>

Heating and cooling networks

Residential Heat Pump Connection

Read more >>

HVAC/R

Carulla Supermarket

Read more >>

    Contact Us