By clicking "OK" or proceeding on this website, you confirm having read and accepted our cookie policy. More details...

Villa Mercedes Biogas Plant

Villa Mercedes, Argentina
Clean local energy from pigs & plants
Villa Mercedes Biogas Plant
Villa Mercedes Biogas Plant
Villa Mercedes Biogas Plant
Villa Mercedes Biogas Plant
Villa Mercedes Biogas Plant

The 30.000 pigs on Villa Mercedes producing 1,5 tons of excrement every day, combined with the farm's sorghum and maize plant wastes will secure a clean local energy supply for years to come with Thermaflex' full-proof solution.

The bio-digesters process the decomposition of the mixture to produce the biogas, which fuels the internal combustion motor to generate 2.4 mWh. A highly efficient distribution could be secured with Flexalen, so that only 25% of the energy is used in the farm and the rest could be sold to a local electricity company. Because of this success, the biogas plant is being expanded and new barns are in construction. These will be used for breeding the pigs, and widening the local energy supply.

Goals

The local energy supplier could only produce 75 kWh, while demand reached 250 kWh. So an increased supply was critical. The production of heat from the cooling system could bring the water to 65°C. Additionally a system was implemented to allow water usage to clean the floors of the pigs as well as the transport sorghum and maize across the entire plant.

Results

  • 1.400 meters of pipes surrounding the countryside of the plantations were connected
  • mostly done with the Flexalen twin pipe 63 mm and Flexalen 75 mm
  • With Flexalen the installers could install 900 meters in one day (twin pipe 450 meters), a significant reduction of the installation time

Additional Info

According to Ing. Javier Ramoska:

Flexalen pre-insulated pipe system of Thermaflex has been chosen because of its low thermal conductivity, its easy installation, its reliable welding technique, its great strength and long lifetime.
Statistics
  • 30000 pigs
  • eating and producing...
  • 1,5 tons
  • of excrement a day. Used to produce...
  • 2,4 MWh
  • of electricity. Of which... 
  • 75 %
  • is sold to the energy company
  • 1400 m
  • of Flexalen 600 installed. Of which...
  • 900 m
  • were installed in 1 day!
Duration
Contacts
Christian Engel
Business Development District Heating / Cooling
Sub.: Thermaflex International Holding
c.engel@thermaflex.com
Address
Villa Mercedes, Argentina
04e3558c fcbf 4023 abbe de133afe09c2

Get in touch

Thermaflex Asia
  Thailand
+66-038 249000-2
View all our offices

Contact request

Share this download

Results attachment
Captcha
Thanks for sharing our download.
Thank you for contacting our office.