In July 2006, the Theurl sawmill was selected by Elektrowerk Assling as energy supplier for the district network connected to the mill. In order to ensure an efficient and reliable supply, a suitable distribution solution was crucial to satisfy its many, and various end users. Our Flexalen pre-insulated pipe system proved ideal in meeting those requirements.
Detalles
Pre-fabricated welding parts and connections allowed for a quick, easy, and homogenous system. The construction project involving 4,300 m of Flexalen DN100/DA110, 950 m of DN80/DA90 and 300 m of various dimensions. The project was completed in October 2006.
Metas
The main focus was laid on an effective use of clean, sustainable and locally produced heat, maximizing the return on investment to convince the local community and weigh out the increasing expenses for oil and gas.
Resultados
During the course of this project in Thal-Aue, the composite lumber production with a total of 14.000 m² of hall area, currently under construction, will also be connected to the local heating network. The difficult terrain clearly demonstrated the advantages of flexible Polybutene pipes. The high flexibility allows the realization of small bending radiuses and offers clear advantages in mobility compared with traditional rigid materials. PB pipes not only require fewer connection points than traditional systems, handling is much more simple due to its flexibility, low weight and easy, yet secure weldability . This made passing under the federal road, the railroad line and the Drava River as well as crossing a mountain stream no problem at all.
Organizaciones
Theurl Sawmill (Energy supplier)
Elektrowerk Assling (Contractor)