Skip to main content
search

Waste-to-energy plant

In the Azores archipelago (Angra do Heroísmo, Terceira), João Pualino Lda and his team are today commissioning a district heating network fed by the local waste-to-energy plant and start benefiting from a readily available source of energy.

Islands by their very nature are conscious about their energy balance.
The project comprises a 1.600kW – 80 Deg C flow district heating network and offers a great example of sensible use of energy that would otherwise be regarded as “waste heat”.

Heating network Island Terceira - Azores
Terceira - Azores pre insulated pipes for heating network

Flexalen PU

The all-plastic flexible Flexalen PU network, works perfect in a rolling landscape and comes with a 100% corrosion free warranty; ideal for coastal climates!

Thermaflex has been of service in the design, delivery and installation training, towards the commissioning of this network.

More news articles

January 5, 2023 in News

Reduce heating costs by correctly insulating your heating system

Reading time: 3 minutes With the ongoing energy crisis, heating costs have skyrocketed, and winter is just around the corner. Now, it's time to save energy and ensure that your…
Read More
December 6, 2022 in Flexalen 600, Flexalen Multiline, Flexalen prefabrications, Flexalen ProtecTube, Flexalen PU, Heating & cooling networks, Insulated piping systems, News

Thermaflex at WarmteNetwerk Congrestival

The event for the Dutch heating chain Stichting Warmtenetwerk organises the Warmte congres 'Congrestival' on 8 December 2022. An inspiring and interactive event for and by everyone in the heat…
Read More

Why Thermaflex?

We develop and supply high-quality technical solutions for insulation, protection, shock resistance and soundproofing.

Customised solutions
100% recyclable insulation products
Project management and support